chromaticbytes.com Forum Index chromaticbytes.com
Graphic Arts for OS X
 
 FAQFAQ   SearchSearch   MemberlistMemberlist   UsergroupsUsergroups   RegisterRegister 
 ProfileProfile   Log in to check your private messagesLog in to check your private messages   Log inLog in 

Fine carved fine works management

 
Post new topic   Reply to topic    chromaticbytes.com Forum Index -> Support
View previous topic :: View next topic  
Author Message
liuyi



Joined: 08 Aug 2016
Posts: 2007

PostPosted: Wed Aug 17, 2016 4:22 am    Post subject: Fine carved fine works management Reply with quote

In steel processing team, for example, the group a total of 12 people swept from cutting, stripping rib wire drawing, welding to CNC machining center operations and other steel work of the whole process, they can produce an average of 1.5 * 40 meters of reinforced every day two cage, bent several semi-finished steel and steel cage processing pass rate of 100%.

"Using advanced mechanization and construction equipment, has greatly improved the level of construction engineering specialization, we no longer as in the past, because doing so worried about slow processing steel construction process of convergence is not on." Wang said.

May 23, Gansu Province Road and Bridge Construction Group held "three" Construction of the first demonstrations at the airport viaduct project, the department Group companies a total of more than 80 people watched the construction of the viaduct project reinforced mechanized preach video scene to observe the reinforcement cage roller welder, workflow and processing quality steel reinforced intelligent CNC bending center of the "three" construction projects to give a high evaluation. Viaduct project as the first observation point, the Group fully open "three" building has played a leading role model.

2016, Lanzhou City, City political commissar Guangming Daily jointly held in Beijing, "China Northwest tour starting in Lanzhou" press conference, for the first time opened the curtain Lanzhou cultural tourism, transportation hub in western Maryland more significant. Lanzhou Airport Northwest as three-dimensional transportation system is an important site, is to showcase the image of Lanzhou, Gansu and even an important "window" and the airport viaduct, will become truly "provincial first gate bridge."

<p>Related Sites:<br>
floor crack repair cost<br>
quick asphalt patching repairing truck<br>
crack seal epoxy resin filler<br>
miniature electric soil compactor in thailand
</p>
Back to top
View user's profile Send private message
Display posts from previous:   
Post new topic   Reply to topic    chromaticbytes.com Forum Index -> Support All times are GMT - 5 Hours
Page 1 of 1

 
Jump to:  
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot vote in polls in this forum


Chromatic Bytes Home

Powered by phpBB © 2001, 2005 phpBB Group