chromaticbytes.com Forum Index chromaticbytes.com
Graphic Arts for OS X
 
 FAQFAQ   SearchSearch   MemberlistMemberlist   UsergroupsUsergroups   RegisterRegister 
 ProfileProfile   Log in to check your private messagesLog in to check your private messages   Log inLog in 

Laying method to warm the floor

 
Post new topic   Reply to topic    chromaticbytes.com Forum Index -> Support
View previous topic :: View next topic  
Author Message
ruckwarmy



Joined: 05 Aug 2016
Posts: 4072

PostPosted: Wed Aug 17, 2016 3:17 am    Post subject: Laying method to warm the floor Reply with quote

Heating system environment is more complex, higher thermal conductivity of the floor, dimensional stability requirements. In order to ensure better heat conduction and prevent deformation of the floor, you should choose a thickness no greater than 8mm laminate flooring. While the average thickness exceeding 8mm solid wood flooring, bamboo flooring, solid wood flooring and laminate flooring it should not be used to warm the system of the occasion.
Before laying claim: pre-construction must heating system for heating water to detect water temperature of at least 50 ℃, heating system is operating normally, and incubated for 12 hours or more. Confirm no leakage before construction. Not the above tests will not be construction; construction method does not allow the destruction of the earth's surface, so as not to damage the cooling coil; the cold in winter construction, flooring should be stored in advance in the field more than 12 hours in order to adapt to changes in temperature, reducing the deformation of the floor; installation should be checked before the ground is flat, dry, clean windows and doors are complete, related facilities for leaks, check the door and the ground clearance is enough; the special mat neatly laid on the ground, at the interface with the adhesive tape sealing; floor laying direction, the long side of the floor should be consistent with the direction of light rooms, the installation of the first row of the long side of the groove to the floor between the walls, the floor and the wall into the wedge, ensure the floor stretching gap 8-12mm, rows and rows of staggered joint between the floor should be installed, and the wrong seam distance should be greater than 20 cm.
Laying should always observe the difference between the height of the plate surface, cracks and other defects, after passing the order and immediately remove glue splice plate surface residual glue; within 12 hours after installation can not walk on the floor, other follow-up operations should be after 24 hours conduct; flooring longer than 8m, or room, at the interface between the coupling hall, hall, floor to be cut off, leaving 8-12mm expansion joint and connected by bars shut to reduce the occurrence of bagging floor.
Related links:
outdoor pool floor

wood garden decoration

balcony flooring
Back to top
View user's profile Send private message
Display posts from previous:   
Post new topic   Reply to topic    chromaticbytes.com Forum Index -> Support All times are GMT - 5 Hours
Page 1 of 1

 
Jump to:  
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot vote in polls in this forum


Chromatic Bytes Home

Powered by phpBB © 2001, 2005 phpBB Group